{"id":10244,"date":"2026-08-25T03:31:50","date_gmt":"2026-08-25T03:31:50","guid":{"rendered":"https:\/\/new-lights.com\/?p=10244"},"modified":"2026-09-14T06:03:40","modified_gmt":"2026-09-14T06:03:40","slug":"us-general-service-lamp-standards-2028-importer-guide","status":"publish","type":"post","link":"https:\/\/new-lights.com\/de\/blog\/us-general-service-lamp-standards-2028-importer-guide\/","title":{"rendered":"US-Standards f\u00fcr General-Service-Lampen: Leitfaden zur Vorbereitung auf 2028 f\u00fcr Importeure"},"content":{"rendered":"<p><strong>The 25 July 2028 US general service lamp deadline is not simply a higher efficacy number. It is a product-scope, basic-model, testing, certification and production-control task.<\/strong> Importers should first determine which exact lamps are covered, then connect each product class to the applicable requirement and preserve one traceable identity from sample through sale.<\/p>\n<p>The US Department of Energy states that compliance with the amended energy-conservation standards for general service lamps is required on and after 25 July 2028. DOE also makes clear that the rule applies to newly manufactured or imported products rather than prohibiting consumers from continuing to use lamps manufactured earlier. This guide is a procurement workflow, not legal advice; current DOE regulations and counsel should be checked for the exact product and transaction.<\/p>\n<h2>Start with a dated product-scope decision<\/h2>\n<p>DOE describes general service lamps as including general service incandescent lamps, compact fluorescent lamps, general service LED lamps, OLED lamps and other lamps used for applications traditionally served by general service incandescent lamps. The definitions and exclusions are technical. A marketing label such as \u201cdecorative,\u201d \u201cspecialty,\u201d \u201cretrofit\u201d or \u201csmart\u201d does not by itself decide whether a lamp is covered.<\/p>\n<figure class=\"wp-block-image aligncenter\" style=\"max-width:900px;margin:32px auto;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-13608 skip-lazy\" data-no-lazy=\"1\" src=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-scope-decision-chain.jpg\" alt=\"Decision chain for classifying a lamp under US general service lamp standards\" width=\"1400\" height=\"820\" style=\"width:100%;height:auto;display:block;\" srcset=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-scope-decision-chain.jpg 1400w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-scope-decision-chain-300x176.jpg 300w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-scope-decision-chain-1024x600.jpg 1024w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-scope-decision-chain-768x450.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><figcaption>Classify the exact product before assigning a standard, test method or launch decision.<\/figcaption><\/figure>\n<p>Create one row for each meaningful configuration. Record shape, base, light output, wattage, voltage, color function, controls, intended application and any feature used to support inclusion or exclusion. Cite the regulatory provision and the date reviewed. If a characteristic or intended use changes, reopen the scope decision.<\/p>\n<figure class=\"wp-block-table\" style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table>\n<thead>\n<tr>\n<th>Scope field<\/th>\n<th>Dokumentation<\/th>\n<th>Escalate when<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Produktidentit\u00e4t<\/td>\n<td>Model, shape, base, voltage and rated output<\/td>\n<td>The commercial name hides multiple constructions<\/td>\n<\/tr>\n<tr>\n<td>Intended function<\/td>\n<td>General illumination or a defined special purpose<\/td>\n<td>Marketing and technical use are inconsistent<\/td>\n<\/tr>\n<tr>\n<td>Definition<\/td>\n<td>Current GSL definition and relevant product class<\/td>\n<td>The lamp may sit near a boundary<\/td>\n<\/tr>\n<tr>\n<td>Exclusion<\/td>\n<td>Exact exclusion text and supporting characteristics<\/td>\n<td>Exclusion depends only on a label or unsupported claim<\/td>\n<\/tr>\n<tr>\n<td>Review control<\/td>\n<td>Reviewer, source version and review date<\/td>\n<td>A rule or product characteristic changes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>For decorative general-lighting products, the <a href=\"\/de\/products\/led-bulbs\/led-filament-bulbs\/led-filament-bulb-general-lighting\/\">New Lights LED Filament Bulb General Lighting family<\/a> is a commercial starting point. Coverage, testing and ratings must still be determined for the exact US configuration.<\/p>\n<h2>Separate current obligations from the 2028 amended standards<\/h2>\n<p>The 2028 date does not pause requirements that already apply. DOE&#8217;s current GSL page identifies the present standards and test procedures, while the amended levels have their own compliance date. A readiness matrix should therefore show the rule in force now, the amended requirement, the affected product class, the test procedure used and the first production or import date under each decision.<\/p>\n<p>This prevents two opposite mistakes: applying a future requirement too early without understanding the current obligation, or treating the future date as permission to ignore today&#8217;s certification and recordkeeping duties. The <a href=\"\/de\/blog\/led-product-compliance-document-checklist\/\">Checkliste f\u00fcr Konformit\u00e4tsunterlagen zu LED-Produkten<\/a> provides a broader method for connecting regulations, reports, declarations, labels and instructions to an exact order code.<\/p>\n<h2>Work backwards from the launch date<\/h2>\n<figure class=\"wp-block-image aligncenter\" style=\"max-width:900px;margin:32px auto;\"><img decoding=\"async\" class=\"wp-image-13609\" src=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-2028-readiness-timeline.jpg\" alt=\"Timeline for US general service lamp readiness from scope review to July 2028 compliance\" width=\"1400\" height=\"820\" style=\"width:100%;height:auto;display:block;\" srcset=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-2028-readiness-timeline.jpg 1400w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-2028-readiness-timeline-300x176.jpg 300w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-2028-readiness-timeline-1024x600.jpg 1024w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-2028-readiness-timeline-768x450.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><figcaption>Allow time for classification, representative samples, testing, data review, certification preparation, packaging approval and production release.<\/figcaption><\/figure>\n<p>Do not plan from 25 July 2028 backwards using laboratory lead time alone. The critical path may include definition questions, sample failures, product redesign, retesting, basic-model grouping, certification-account preparation, packaging revisions, customer approvals and inventory transitions.<\/p>\n<p>A practical plan can use five gates:<\/p>\n<ol>\n<li>Complete the covered-product inventory and scope decisions.<\/li>\n<li>Freeze the intended US configurations and basic-model strategy.<\/li>\n<li>Approve representative samples and applicable test procedures.<\/li>\n<li>Review data, certification fields, labels and commercial claims together.<\/li>\n<li>Release production only after the approved evidence and configuration match.<\/li>\n<\/ol>\n<h2>Die Identit\u00e4t des Grundmodells festlegen<\/h2>\n<p>A compliance file is useful only when it maps to what is manufactured and sold. Quotations, drawings, bills of materials, test samples, laboratory reports, certification records, packaging and online listings should use the same controlled reference or a documented relationship.<\/p>\n<figure class=\"wp-block-image aligncenter\" style=\"max-width:900px;margin:32px auto;\"><img decoding=\"async\" class=\"wp-image-13610\" src=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-basic-model-evidence-chain.jpg\" alt=\"Evidence chain connecting lamp samples testing certification and production\" width=\"1400\" height=\"820\" style=\"width:100%;height:auto;display:block;\" srcset=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-basic-model-evidence-chain.jpg 1400w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-basic-model-evidence-chain-300x176.jpg 300w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-basic-model-evidence-chain-1024x600.jpg 1024w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-basic-model-evidence-chain-768x450.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><figcaption>Preserve a traceable identity from the selected sample through testing, certification and production.<\/figcaption><\/figure>\n<p>Basic-model grouping should not be treated as a clerical shortcut. The importer should understand which variants are represented, how ratings are assigned and which changes could invalidate the relationship. A report for one construction does not automatically support unrelated shapes, powers, optical systems or driver designs.<\/p>\n<p>Die <a href=\"\/de\/blog\/evaluate-led-lighting-suppliers-beyond-unit-price\/\">supplier evaluation guide<\/a> explains why sample approval and mass-production consistency are separate risks. The <a href=\"\/de\/blog\/led-lighting-sample-evaluation-checklist\/\">Checkliste zur Bewertung von LED-Beleuchtungsmustern<\/a> can be used to record the physical and documentary identity of the evaluated unit.<\/p>\n<h2>Define the evidence hierarchy before testing<\/h2>\n<p>Agree which evidence controls each claim. The regulation and current DOE guidance define the legal framework. The applicable test procedure defines how the regulated value is determined. Laboratory records document the tested sample and result. Certification records communicate represented values. Production records show whether shipped goods remain within the approved definition.<\/p>\n<figure class=\"wp-block-table\" style=\"max-width:100%;overflow-x:auto;-webkit-overflow-scrolling:touch;\">\n<table>\n<thead>\n<tr>\n<th>Nachweisgrundlage<\/th>\n<th>Core question<\/th>\n<th>Minimum control<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Regulation<\/td>\n<td>Is this product covered, and what requirement applies?<\/td>\n<td>Current citation and dated scope decision<\/td>\n<\/tr>\n<tr>\n<td>Testmethode<\/td>\n<td>How must the regulated value be determined?<\/td>\n<td>Procedure edition and sample plan<\/td>\n<\/tr>\n<tr>\n<td>Laboratory<\/td>\n<td>What exactly was tested and what were the results?<\/td>\n<td>Sample identity, raw data and report revision<\/td>\n<\/tr>\n<tr>\n<td>Zertifizierung<\/td>\n<td>Which basic model and ratings are represented?<\/td>\n<td>Submission record and responsible party<\/td>\n<\/tr>\n<tr>\n<td>Product\/label<\/td>\n<td>Do claims and markings match the represented values?<\/td>\n<td>Approved artwork and model mapping<\/td>\n<\/tr>\n<tr>\n<td>Produktion<\/td>\n<td>Does the shipped configuration remain represented?<\/td>\n<td>BOM revision, inspection and change control<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p>Die <a href=\"\/de\/blog\/lighting-product-data-eu-digital-product-passport\/\">EU product-data and digital product passport guide<\/a> covers a different jurisdiction, but its model-data discipline is relevant: product records should remain machine- and human-readable, revision-controlled and tied to the correct configuration. It must not be used as a substitute for US DOE requirements.<\/p>\n<h2>Treat test procedure changes as controlled inputs<\/h2>\n<p>DOE published clarifications to GSL test procedures in 2025, including instructions for colored-lamp treatment, additional components and certain non-integrated lamps. The DOE GSL page identifies when those amendments became mandatory for product testing. A readiness file should therefore record the procedure and date used rather than referring generically to a \u201clatest test.\u201d<\/p>\n<p>Ask the laboratory and supplier to confirm the exact product class, procedure appendix, sample configuration, auxiliary settings and represented ratings. If testing spans a rule transition, document which procedure supports which submission or decision.<\/p>\n<h2>Link engineering changes to compliance impact<\/h2>\n<p>LED packages, drivers, current settings, optics, thermal parts, firmware and control functions can affect power, light output or represented performance. A component with the same commercial description is not automatically equivalent.<\/p>\n<figure class=\"wp-block-image aligncenter\" style=\"max-width:900px;margin:32px auto;\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13611\" src=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-change-control-impact-map.jpg\" alt=\"Change control map from lamp component change to compliance evidence and release\" width=\"1400\" height=\"820\" style=\"width:100%;height:auto;display:block;\" srcset=\"https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-change-control-impact-map.jpg 1400w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-change-control-impact-map-300x176.jpg 300w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-change-control-impact-map-1024x600.jpg 1024w, https:\/\/new-lights.com\/wp-content\/uploads\/2026\/09\/gsl-change-control-impact-map-768x450.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><figcaption>Review the technical impact, evidence, certification and claims before releasing a changed configuration.<\/figcaption><\/figure>\n<p>The change request should identify the old and new parts, affected models, technical rationale, expected effect, required verification, certification impact and approval owner. Even when the conclusion is \u201cno retest required,\u201d preserve the dated rationale and evidence used.<\/p>\n<p>Buyers can review the <a href=\"\/de\/about\/factory-manufacturing\/\">New Lights factory and manufacturing overview<\/a> when discussing BOM control, inspection and traceability. Available product files can be checked through the <a href=\"\/de\/download\/\">download centre<\/a>.<\/p>\n<h2>Checkliste f\u00fcr die Importbereitschaft<\/h2>\n<ol>\n<li>Build a complete list of US-bound lamp configurations.<\/li>\n<li>Record a dated inclusion, exclusion and product-class decision for each.<\/li>\n<li>Separate current requirements from the standards effective 25 July 2028.<\/li>\n<li>Freeze model identity, variants and basic-model relationships.<\/li>\n<li>Confirm the applicable test procedure and representative sample plan.<\/li>\n<li>Map every report and represented rating to an exact configuration.<\/li>\n<li>Align certification fields, packaging, listings and customer data.<\/li>\n<li>Define component and firmware change-control triggers.<\/li>\n<li>Plan inventory and manufacturing dates around the compliance boundary.<\/li>\n<li>Assign owners for regulatory monitoring, testing, certification and release.<\/li>\n<\/ol>\n<h2>H\u00e4ufig gestellte Fragen<\/h2>\n<h3 class=\"nls-toc-exclude\">Does every LED bulb fall within the GSL rule?<\/h3>\n<p>No. Coverage depends on the current definition, exclusions and exact product characteristics. \u201cLED bulb\u201d or \u201cdecorative lamp\u201d is not a complete classification.<\/p>\n<h3 class=\"nls-toc-exclude\">Is 25 July 2028 only a sales deadline?<\/h3>\n<p>DOE describes the amended standards as applying to newly produced or imported GSLs from that date. The exact treatment of inventory and transactions should be checked against current official requirements and legal advice.<\/p>\n<h3 class=\"nls-toc-exclude\">Can one test report cover an entire family?<\/h3>\n<p>Only when the grouping and represented ratings are permitted and technically supported. The importer should document which configurations are represented and why.<\/p>\n<h3 class=\"nls-toc-exclude\">Does a compliant laboratory result complete the process?<\/h3>\n<p>No. The result must map to the basic model, certification records, product claims, labeling and current production configuration.<\/p>\n<h3 class=\"nls-toc-exclude\">When should readiness work begin?<\/h3>\n<p>Begin with scope and data-gap review now. Testing and redesign schedules should include time for failed samples, new evidence, artwork changes and customer approvals rather than assuming one successful laboratory cycle.<\/p>\n<h2>Prepare the model inventory now<\/h2>\n<p>For a US-bound lamp review, <a href=\"\/de\/contact\/\">Kontaktieren Sie New Lights<\/a> with the intended product configurations, bases, shapes, output range, control functions, launch timing and evidence requirements. The first useful deliverable is a controlled model matrix\u2014not a generic promise of 2028 readiness.<\/p>\n<h2 class=\"nls-toc-exclude\">Redaktionelle Quellen<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.energy.gov\/cmei\/buildings\/general-service-lamps\" target=\"_blank\" rel=\"noopener\">US Department of Energy \u2014 General Service Lamps<\/a><\/li>\n<li><a href=\"https:\/\/www.energy.gov\/articles\/doe-finalizes-efficiency-standards-lightbulbs-save-americans-billions-household-energy\" target=\"_blank\" rel=\"noopener\">US Department of Energy \u2014 DOE Finalizes Efficiency Standards for Lightbulbs<\/a><\/li>\n<li><a href=\"https:\/\/www.federalregister.gov\/documents\/2024\/04\/19\/2024-07831\/energy-conservation-program-energy-conservation-standards-for-general-service-lamps\" target=\"_blank\" rel=\"noopener\">Federal Register \u2014 Energy Conservation Standards for General Service Lamps, 89 FR 28856<\/a><\/li>\n<li><a href=\"https:\/\/www.energy.gov\/sites\/default\/files\/2025-01\/gsl-tp-fr.pdf\" target=\"_blank\" rel=\"noopener\">US Department of Energy \u2014 2025 GSL Test Procedure Clarifications<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Bereiten Sie sich mit einem Plan f\u00fcr Modellumfang, Pr\u00fcfung, Zertifizierung und ?nderungssteuerung auf die ab dem 25. Juli 2028 geltenden US-Normen f\u00fcr allgemeine Gebrauchslampen vor.<\/p>","protected":false},"author":1,"featured_media":13612,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_angie_page":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"page_builder":"","footnotes":""},"categories":[152],"tags":[],"class_list":["post-10244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-market-insights"],"acf":[],"_links":{"self":[{"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/posts\/10244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/comments?post=10244"}],"version-history":[{"count":3,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/posts\/10244\/revisions"}],"predecessor-version":[{"id":13614,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/posts\/10244\/revisions\/13614"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/media\/13612"}],"wp:attachment":[{"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/media?parent=10244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/categories?post=10244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new-lights.com\/de\/wp-json\/wp\/v2\/tags?post=10244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}